您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF BLADE BREAKAGE IN LOWPRESSURE CYLINDER OF C50-90/13 TYPE STEAM TURBINE AND COMPARISON OF RESOLVING COUNTERMEASURES THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF BLADE BREAKAGE IN LOWPRESSURE CYLINDER OF C50-90/13 TYPE STEAM TURBINE AND COMPARISON OF RESOLVING COUNTERMEASURES THEREOF

    • Thermal Power Generation   Issue 5, Pages: 48-50(2003)
    • DOI:10.19666/j.rlfd.2003.05.015    

      CLC: TK263.1
    • Published:2003

    移动端阅览

  • CAUSE ANALYSIS OF BLADE BREAKAGE IN LOWPRESSURE CYLINDER OF C50-90/13 TYPE STEAM TURBINE AND COMPARISON OF RESOLVING COUNTERMEASURES THEREOF[J]. Thermal power generation, 2003, (5): 48-50. DOI: 10.19666/j.rlfd.2003.05.015.

  •  
  •  

0

Views

63

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Security analysis of blade-disc in governing stage under various sequence valve modes
FAILURE ANALYSIS AND PREVENTION OF "851"BLADE BREAKAGE
RETROFIT OF LOW-PRESSURE CASING'S FLOW PASSAGE FOR 200 MW STEAM TURBINES IN SHAOGUANG POWER PLANT
MECHANISM ANALYSIS OF PITTING ATTACK DAMAGE FOR BLADES OF 300MW STEAM TURBINE AND PREVENTIVE MEASURES THEREOF
TEST AND STUDY ON ELEVATION CHANGING REGULARITY OF LP CYLINDER AND LP BEARINGS FOR A 300MW STEAM TURBINE

Related Author

CHANG Dongfeng
JIA Hongjin
JIANG Hao
GU Weiwei
王荻
朱洪波
郑彩平
程绍兵

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Huaneng Nanjing Jinling Power Generation Co.,Ltd.
Guangdong Electric Power Test and Research Institute
Guangdong Electric Power Group Co., Ltd.
Shaoguan Power Plant Guangdong Shaoguan
0