STUDY ON TECHNICAL RETROFIT OF FUEL COAL PULVERIZED SYSTEM REGARDING 130t/h BOILERS IN YILI THERMAL POWER PLANT No.2[J]. Thermal power generation, 2003, (5): 27-30.
DOI:
STUDY ON TECHNICAL RETROFIT OF FUEL COAL PULVERIZED SYSTEM REGARDING 130t/h BOILERS IN YILI THERMAL POWER PLANT No.2[J]. Thermal power generation, 2003, (5): 27-30. DOI: 10.19666/j.rlfd.2003.05.009.
STUDY ON TECHNICAL RETROFIT OF FUEL COAL PULVERIZED SYSTEM REGARDING 130t/h BOILERS IN YILI THERMAL POWER PLANT No.2
摘要
伊犁第二火电厂 2台 2 5MW机组锅炉投运后
长期存在制粉系统出力不足、锅炉负荷低和结焦等问题
导致炉膛出口烟温高于设计值 2 0 0℃以上
热风温度达 5 5 0℃
因而机组只能低负荷运行
且连续运行时间短。经对制粉系统、煤质、燃烧工况等进行分析和试验
并对其进行了有效的调试和改造
较好地解决了问题。
Abstract
After putting the tittle boilers into operation. troublesome problems
such as insufficient output capacity of the coal pulverized system
low load capability of said boilers
and slagging in the furnace etc.
have been existing in a very long period of time
leading the furnace outlet flue gas temperature to be above 200℃ higher than the desighed value
and hot air temperature to reach 550℃
hence
the units can only be operated under low load condition
and the time of consecutive operation being short. Throwgh analysis and testing of the said coal pulverized system
quality of fuel coal
and combustion conditions etc. effective debugging and retrofitting have been carried out
making the said problems to be satisfactorily resolved.