ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT
更新时间:2025-09-28
    • ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT

    • Thermal Power Generation   Issue 4, Pages: 55-56(2003)
    • DOI:10.19666/j.rlfd.2003.04.020    

      CLC: TH31
    • Published:2003

    移动端阅览

  • PENG Yi. ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT[J]. Thermal power generation, 2003, (4): 55-56. DOI: 10.19666/j.rlfd.2003.04.020.

  •  
  •  

0

Views

46

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis and optimization on run back control strategy for unit with CFB boiler
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS
ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT

Related Author

WANG Fei
HE Jinqi Northwest Power Construction Commissioning Institute
SUN Shu-yang
DAI Chuan-long
杨群
周平涛
ZHANG Cun-sheng
田丰

Related Institution

Northwest Electric Power Construction and Debugging Research Institute
Jianbi Power Plant
Shenzhen West Electric Power Co., Ltd
Mawan Power Plant
0