您当前的位置:
首页 >
文章列表页 >
RETROFITTING COAL FEEDER CONTROL SYSTEM OF 300 MW GENERATING UNITS
更新时间:2025-09-28
    • RETROFITTING COAL FEEDER CONTROL SYSTEM OF 300 MW GENERATING UNITS

    • Thermal Power Generation   Issue 4, Pages: 44-45(2003)
    • DOI:10.19666/j.rlfd.2003.04.015    

      CLC: TK223.24
    • Published:2003

    移动端阅览

  • RETROFITTING COAL FEEDER CONTROL SYSTEM OF 300 MW GENERATING UNITS[J]. Thermal power generation, 2003, (4): 44-45. DOI: 10.19666/j.rlfd.2003.04.015.

  •  
  •  

0

Views

152

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of low-grade energy heating technology in central heating by cogeneration
Study and realization of transforming induced draft fans with adjustable stator blades into ones with adjustable rotor blades in a 600 MW unit
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS

Related Author

DING Jianhai
LI Junhong
LIU Suoqing
ZHENG Jin
CHENG Yan
HU Jun
SUN Dawei
CHANG Changhui

Related Institution

Jiajie Gas Thermal Power Plant, Jinneng Group Co., Ltd.
School of Automation, Shanxi University
School of Energy Power, Shanxi University
Xi'an Thermal Power Research Institute Co.,Ltd.
An'hui Maanshan Wangnengda Power Plant,Maanshan
0