您当前的位置:
首页 >
文章列表页 >
TECHNICAL STUDY FOR RETROFITTING A 75t/h PULVERIZED COAL BOILER INTO A FLUID BED ONE AT ULANBATOR POWER PLANT NO.3, THE MONGOLIAN PEOPLE'S REPUBLIC
更新时间:2025-09-28
    • TECHNICAL STUDY FOR RETROFITTING A 75t/h PULVERIZED COAL BOILER INTO A FLUID BED ONE AT ULANBATOR POWER PLANT NO.3, THE MONGOLIAN PEOPLE'S REPUBLIC

    • Thermal Power Generation   Issue 3, Pages: 33-35(2003)
    • DOI:10.19666/j.rlfd.2003.03.010    

      CLC: TK229.6
    • Published:2003

    移动端阅览

  • TECHNICAL STUDY FOR RETROFITTING A 75t/h PULVERIZED COAL BOILER INTO A FLUID BED ONE AT ULANBATOR POWER PLANT NO.3, THE MONGOLIAN PEOPLE'S REPUBLIC[J]. Thermal power generation, 2003, (3): 33-35. DOI: 10.19666/j.rlfd.2003.03.010.

  •  
  •  

0

Views

70

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

RETROFIT OF TWO 130t/h PULVERIZED COAL BOILERS IN YILI THERMAL POWER PLANT NO.2 DUE TO HIGH EXHAUST GAS TEMPERATURE THEREOF
流化移动叠置式冷渣器研究
石煤流化床锅炉灰渣高效综合利用研究
RETROFITTING HEAT RECOVERY SURFACE OF BOILER NO.3 AT KAIFENG POWER PLANT
A MODEL FOR OVERALL SLAGGING DIAGNOSIS IN PULVERIZED-COAL FIRED BOILERS

Related Author

李江勇
冯建强
聂剑平
智华亭
岑可法
王勤辉
施正展
骆仲泱

Related Institution

Yili Second Thermal Power Plant
Ili Second Thermal Power Plant Xinjiang Yining
Xinjiang Yining
浙江杭州310027
Zhejiang University
0