您当前的位置:
首页 >
文章列表页 >
LOW LOAD OPERATION AND ECONOMIC ANALYSIS OF 125MW STEAM TURBINE
更新时间:2025-09-28
    • LOW LOAD OPERATION AND ECONOMIC ANALYSIS OF 125MW STEAM TURBINE

    • Thermal Power Generation   Issue 6, Pages: 59-63(2002)
    • DOI:10.19666/j.rlfd.2002.06.019    

      CLC: TK267
    • Published:2002

    移动端阅览

  • LOW LOAD OPERATION AND ECONOMIC ANALYSIS OF 125MW STEAM TURBINE[J]. Thermal power generation, 2002, (6): 59-63. DOI: 10.19666/j.rlfd.2002.06.019.

  •  
  •  

0

Views

417

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DIAGNOSIS OF BEARING VIBRATION ON UNIT NO.1 IN HEZE POWER PLANT
Coordinated control and optimization for unit equipped with single-line auxiliaries during low load operation
CAUSE ANALYSIS OF OVER-TEMPRATURE OCCURRED ON THRUST BEARING SHOE OF A N50-8.83-II TYPE TURBINE-GENERATOR SET
ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET

Related Author

DONG Zhong-junGuodian Heze Power Plant
Du Hua-zhong
WANG Han-min
WANG Qing-xiang
SHENG Xi-bing
ZHOU Lingyu
ZHOU Zhipei
LIU Honggang

Related Institution

Guodian Heze Power Plant
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Luoyang Power Generation Co.,Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Shanxi Yongji
0