您当前的位置:
首页 >
文章列表页 >
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS
更新时间:2025-09-28
    • APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS

    • Thermal Power Generation   Issue 5, Pages: 70-73(2002)
    • DOI:10.19666/j.rlfd.2002.05.023    

      CLC: TK323
    • Published:2002

    移动端阅览

  • APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS[J]. Thermal power generation, 2002, (5): 70-73. DOI: 10.19666/j.rlfd.2002.05.023.

  •  
  •  

0

Views

40

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT
热电联产机组选型通用软件的开发
APPLICATION OF DYNAMIC PROGRAMMING ON LOAD DISTRIBUTION OPTIMIZATION AMONG HOME-MADE 300MW GENERATING UNITS

Related Author

SUN Shu-yang
DAI Chuan-long
ZHANG Cun-sheng
钟文琪
顾利锋
田丰
周绍兴
李新康

Related Institution

Jianbi Power Plant
The Pearl River Power Plant Guangzhou
Southeast University
Southeast University
江苏南京210096
0