您当前的位置:
首页 >
文章列表页 >
COMBUSTION TESTING FOR RETROFITTING OIL-FIRED BOILER NO.2 AT MAOMING THERMAL POWER PLANT TO BURN WATER-COAL SLURRY
更新时间:2025-09-28
    • COMBUSTION TESTING FOR RETROFITTING OIL-FIRED BOILER NO.2 AT MAOMING THERMAL POWER PLANT TO BURN WATER-COAL SLURRY

    • Thermal Power Generation   Issue 5, Pages: 44-45(2002)
    • DOI:10.19666/j.rlfd.2002.05.014    

      CLC: TK229
    • Published:2002

    移动端阅览

  • COMBUSTION TESTING FOR RETROFITTING OIL-FIRED BOILER NO.2 AT MAOMING THERMAL POWER PLANT TO BURN WATER-COAL SLURRY[J]. Thermal power generation, 2002, (5): 44-45. DOI: 10.19666/j.rlfd.2002.05.014.

  •  
  •  

0

Views

104

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION STUDY OF TWO-PURPOSE BURNERS WITH SIDE AIR FLOW FOR BURNING FUEL OIL AND COAL-WATER SLURRY
EXPERIMENT AND SIMULATION COMPUTATION OF HIGH TEMPERATURE AIR COMBUSTION
TEST AND RESEARCH CONCERNING THREE KINDS OF ADDITIVES USED TO OIL-FIRED BOILERS
EXPERAMENTAL STUDY ON FLOW FIELD BEHAVIOR CONCERNING THE CROSSED JET FLOWS OF MICROSWIRLING PRIMARY AIR AS WELL AS UPPER AND LOWER SECONDARY AIR
TEST AND STUDY ON SHENHUA BLEDED COAL BURNING IN CFB BOILER

Related Author

曹大东
彭艳
赵无非
睢向荣
唐必光
杨建国
郑航
冯国华

Related Institution

Shanghai Research Institute
Wuhan University
Xi'an Thermal Power Research Institute Co.,Ltd.
Henan Zhengzhou Yahong Electric Power Equipment Co., Ltd
4:浙江大学
0