以重庆发电厂 2× 2 0 0MW机组烟气脱硫装置中的湿式球磨机为例
介绍了湿式球磨机系统及其运行特性
Taking the wet type ball mill in flue gas desulfurization system of 2×200MW units at Chongqing Power Plant as example
the wet type ball mill system and its operational performance are described.