您当前的位置:
首页 >
文章列表页 >
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
更新时间:2025-09-28
    • COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT

    • Thermal Power Generation   Issue 4, Pages: 2-6(2002)
    • DOI:10.19666/j.rlfd.2002.04.001    

      CLC: TK261
    • Published:2002

    移动端阅览

  • DAI Chuan-long. COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT[J]. Thermal power generation, 2002, (4): 2-6. DOI: 10.19666/j.rlfd.2002.04.001.

  •  
  •  

0

Views

95

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DIAGNOSIS AND ANALYSIS OF ENERGY-SAVING FOR 300 MW UNIT IN SHAJIAO A POWER PLANT
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Review of the development and application of double-reheat power generation technology
Definition review of heat rate in thermal power plant evaluation

Related Author

HU Guangming1
XU Fangyou1
LIU Guangyao2
YAN Junjie21.Yuedian Shajiao A Power Plant
PEI Dongsheng
BAO Weiwei
LIU Shilei
FU Yiwei

Related Institution

Guangdong Electric Shajiao A Power Plant
School of Energy and Power Engineering, Xi'an Jiaotong University
西安热工研究院有限公司
哈尔滨汽轮机厂有限责任公司
华能苏州热电有限责任公司
0