COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
The successful experience of retrofitting a 300MW unit manufactured by Shanghai Steam Turbine Factory in early years and installed at Jianbi Power Plant has been presented. The retrofitting results are analyzed via using the thermodynamic test data before and after the retrofitting
and a quantitative calculation of related factors in the thermal system is carried out via utilizing an equivalent heat-drop method
some parts and equipment's possessing potential to be retrofitted are found
providing with scientific basis for further retrofitting the unit.