您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF CONDENSER TUBE LEAKAGE AT DATONG THERMAL POWER PLANT №2
更新时间:2025-09-28
    • CAUSE ANALYSIS OF CONDENSER TUBE LEAKAGE AT DATONG THERMAL POWER PLANT №2

    • Thermal Power Generation   Issue 2, Pages: 50-51(2002)
    • DOI:10.19666/j.rlfd.2002.02.015    

      CLC: TK267
    • Published:2002

    移动端阅览

  • CAUSE ANALYSIS OF CONDENSER TUBE LEAKAGE AT DATONG THERMAL POWER PLANT №2[J]. Thermal power generation, 2002, (2): 50-51. DOI: 10.19666/j.rlfd.2002.02.015.

  •  
  •  

0

Views

49

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF FAULTS OCCURRED ON HIGH-PRESSURE FEED-WATER PUMPS AND IMPROVEMENTS OF REPAIR TECHNIQUES
Thermal fatigue failure analysis for drainage-tank in hot section of reheat pipeline in an ultra supercritical 1 000 MW unit
Vibration analysis of axial flow fan for large capacity unit
Comparative analysis of calculation standards for pipe hanger interval
Flexuous vibration characteristics of HP/IP rotor in a 1 000 MW nuclear power unit

Related Author

Su Shaolin
LOU Yumin
PENG Yichao
TU Rongfeng
XU Haohao
WANG Xianming
HE Xiaofeng
GAO Xiaopin

Related Institution

Guangzhou Petrochemical General Factory Inspection and Safety Company
Zhejiang Energy R&D Co., Ltd.
Zhejiang Zhoushan Coal-based Power Co., Ltd.
Jiangsu Frontier Electric Technologies Co.,Ltd.
Northwest Electric Power Design Institute
0