TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE
更新时间:2025-09-28
    • TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE

    • Thermal Power Generation   Issue 6, Pages: 34-35(2001)
    • DOI:10.19666/j.rlfd.2001.06.009    

      CLC: TK229.6
    • Published:2001

    移动端阅览

  • TECHNICAL RETROFIT OF A 410t/h CFB BOILER AT GAOBA POWER PLANT OF NEIJIANG CITY, SICHUAN PROVINCE[J]. Thermal power generation, 2001, (6): 34-35. DOI: 10.19666/j.rlfd.2001.06.009.

  •  
  •  

0

Views

80

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
A STUDY OF OPERATIONAL PERFORMANCE FOR CFB BOILERS
关于我国大、中容量火电机组给水泵更新改造的意见和建议
EXPERIMENTAL INVESTIGATION ON HEAT TRANSFER COEFFICIENT OF CFB BOILER IN GAOBA POWER PLANT
ANALYSIS AND EVALUATION OF TECHNICAL RETROFITTING FOR FLOW PASSAGE PART OF 100MW TURBINE AT QINGSHAN THERMAL POWER PLANT

Related Author

ZHANG Jiansheng
吴正舜
申莉
刘德昌
肖兴和
张敏
肖平
吕怀安

Related Institution

Shenhua Guoneng (Shendong Power) Group
Huazhong University of Science and Technology
Guodian Thermal Power Research Institute
Guodian Thermal Power Research Institute
Qingshan Thermal Power Plant
0