OPTIMIZING RETROFIT OF FORCED DRAFT SYSTEM FOR BOILER NO4 AT HUANGDAO POWER PLANT
更新时间:2025-09-28
    • OPTIMIZING RETROFIT OF FORCED DRAFT SYSTEM FOR BOILER NO4 AT HUANGDAO POWER PLANT

    • Thermal Power Generation   Issue 5, Pages: 51-52(2001)
    • DOI:10.19666/j.rlfd.2001.05.017    

      CLC: TK223.26
    • Published:2001

    移动端阅览

  • OPTIMIZING RETROFIT OF FORCED DRAFT SYSTEM FOR BOILER NO4 AT HUANGDAO POWER PLANT[J]. Thermal power generation, 2001, (5): 51-52. DOI: 10.19666/j.rlfd.2001.05.017.

  •  
  •  

0

Views

71

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Resistance characteristics of 90° shrunk bend pipe connector of flue gas duct for a 1 000 MW unit
Numerical modeling and optimal design of flow field for a wet electrostatic precipitator system
OPTIMIZED DESIGN OF HEAT,ELECTRICITY,AND COOL TRIPLE CO-GENERATION SYSTEM IN BUILDINGS,AS WELL AS SENSITIVITY ANALYSIS THEREOF
NUMERICAL INVESTIGATION ON AIR FLOW AND HEAT TRANSFER PERFORMANCE OUTSIDE TRIPLE ROW TUBE USED IN DIRECT AIR COOLING CONDENSER
Influence of wind direction on performance of indirect air cooled radiator in a dry cooling tower

Related Author

ZHANG Zhiqiang
HU Xiaobiao
QI Xuan
LI Zhiqiang
SHEN Zhiyong
MA Xiuyuan
ZHANG Jun21.Mechanical Deparment
YUAN Yu-mei1

Related Institution

School of Power and Mechanical Engineering, Wuhan University
State Power Environmental Protection Research Institute
Department of Mechanical Engineering, Jiangsu University of Technology
College of Resources and Environmental Sciences, Wuhan University
School of Civil and Architectural Engineering, Beijing Jiaotong University
0