您当前的位置:
首页 >
文章列表页 >
EXPERIMENT STUDY ON HP HEATER FOR TURBINE No.1 IN PINGWE1 POWER PLANT
更新时间:2025-09-28
    • EXPERIMENT STUDY ON HP HEATER FOR TURBINE No.1 IN PINGWE1 POWER PLANT

    • Thermal Power Generation   Issue 2, Pages: 40-42(2001)
    • DOI:10.19666/j.rlfd.2001.02.014    

      CLC: TK264.9
    • Published:2001

    移动端阅览

  • GUO Qi-xiang. EXPERIMENT STUDY ON HP HEATER FOR TURBINE No.1 IN PINGWE1 POWER PLANT[J]. Thermal power generation, 2001, (2): 40-42. DOI: 10.19666/j.rlfd.2001.02.014.

  •  
  •  

0

Views

82

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT
A TENTATIVE IDEA FOR ENHANCING THE HIGI-PRESSURE HEATER'S RELIABILITY OF LARGE-SCALE UNITS
CAUSE ANALYSIS OF THE HIGH-PRESSURE HEATER'S FAULTS FOR LARGE-CAPACITY UNIT AND COUNTERMEASURES THEROF
REMOTE FIELD EDDY-CURRENT INSPECTION FOR THE ON-SERVICE HIGH-PRESSURE FEED-WATER HEATER IN POWER PLANTS
FAILURE ANALYSIS FOR HIGH-PRESSURE HEATER OF 200 MW STEAM-TURBINE UNITS IN ONE THERMAL POWER PLANT

Related Author

ZHANG Cun-sheng
姚雅秋
李守伦
杨祥良
张明智
周兰欣
冯兴隆
李延群

Related Institution

The Pearl River Power Plant Guangzhou
Jiaozuo Power Plant
Rizhao Power Plant
North China Electric Power University
0