您当前的位置:
首页 >
文章列表页 >
REALIZATION OF COUNTING THE RATE OF PUTTING AUTOMATICS INTO OPERATION OF MEDIUM-SIZED UNIT AT POWER PLANT
更新时间:2025-09-28
    • REALIZATION OF COUNTING THE RATE OF PUTTING AUTOMATICS INTO OPERATION OF MEDIUM-SIZED UNIT AT POWER PLANT

    • Thermal Power Generation   Issue 1, Pages: 5-7(2001)
    • DOI:10.19666/j.rlfd.2001.01.002    

      CLC: TM76
    • Published:2001

    移动端阅览

  • REALIZATION OF COUNTING THE RATE OF PUTTING AUTOMATICS INTO OPERATION OF MEDIUM-SIZED UNIT AT POWER PLANT[J]. Thermal power generation, 2001, (1): 5-7. DOI: 10.19666/j.rlfd.2001.01.002.

  •  
  •  

0

Views

33

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental study on circulating water treatment in coal-fired power plants using Nanofiltration process
Numerical simulation on optimization for MGGH flue in thermal power plants
Reliability state identification for key auxiliary equipments in thermal power units
Effect of heightening windbreak on flow field of a direct air coolling system
Features and key process of water saving and wastewater discharge reduction in thermal power plants at current situation

Related Author

LI Yajuan
SHEN Jianxun
WU Zhongquan
XU Zhen
HUANG Qian
GUO Yanling
BAI Ling
WANG Linghua

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Huaneng International Electric Inc.
China Datang Corporation Science and Technology Research Institute Northwest Branch
Guohua Electric Power Branch, China Shenhua Energy Co., Ltd.
Institute of Electric Power,North China University of Water Resources and Electric Power
0