您当前的位置:
首页 >
文章列表页 >
410t/h煤粉炉改造为循环流化床锅炉方案设计
更新时间:2025-09-28
    • 410t/h煤粉炉改造为循环流化床锅炉方案设计

    • Thermal Power Generation   Issue 5, Pages: 55-58(2000)
    • DOI:10.19666/j.rlfd.2000.05.019    

      CLC: TK229
    • Published:2000

    移动端阅览

  • [J]. Thermal power generation, 2000, (5): 55-58. DOI: 10.19666/j.rlfd.2000.05.019.

  •  
  •  

0

Views

171

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DESIGN AND OPERATION OF 220t/h CIRCULATING FLUIDIZED BED BOILER
A STUDY ON THE DESIGN OF DOMESTIC 300MW CFB BOILERS
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Modelling for unburned carbon content in fly ash from coal-fired boilers based on adaptive neuro-fuzzy inference system
Numerical simulation on dynamic performance of combustion and flue gas system in a 300 MW oxy-coal fired boiler

Related Author

包绍麟
吕清刚
那永洁
孙运凯
毛军华
王政
苏小平
杨浩

Related Institution

Wuxi Huaguang Boiler Co., Ltd
Institute of Engineering Thermophysics, Chinese Academy of Sciences
State Power Corporation Thermal Research Institute
Thermal Power Research Institute of State Power Corporation
0