Mawan Power Plant was installed with a 300 MW boiler manufactured with GE license.Some proposals were made to improve and optimize the major parts of configuration logic of BMS.Good results were obtained after practical application.
Optimization of the mode of outlet conditions for opposed spiral firing burners
Numerical simulation of combustion process in a tangentially pulverized-coal-fired boiler under variable load operation
Experimental investigation on ignition of low-volatile pulverized coal in a tiny- oil burner under oxygen-enriched conditions
OPTIMIZTION OF RETROFITTNG SCHEME FOR THE COMBUSTIN SYSTEM
TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1
Related Author
LI Xinhao
WANG Chunbo
GUO Yongcheng
ZOU Chan
WANG Qiuhong
WANG Chao
ZHANG Xiaotao
WANG Aijun
Related Institution
School of Energy and Power Engineering, North China Electric Power University
School of Electric Power, North China University of Water Resources and Electric Power
Xinxiang Aviation Industry (Group) Co.,Ltd.
Shandong Electric Power Engineering Consulting Institute Co.,Ltd.