您当前的位置:
首页 >
文章列表页 >
TEST OF ECONOMIC PERFORMANCE OF A UPGRADED 48SH-22 CIRCULATING PUMP
更新时间:2025-09-28
    • TEST OF ECONOMIC PERFORMANCE OF A UPGRADED 48SH-22 CIRCULATING PUMP

    • Thermal Power Generation   Issue 3, Pages: 31-32(2000)
    • DOI:10.19666/j.rlfd.2000.03.010    

      CLC: TM621
    • Published:2000

    移动端阅览

  • TEST OF ECONOMIC PERFORMANCE OF A UPGRADED 48SH-22 CIRCULATING PUMP[J]. Thermal power generation, 2000, (3): 31-32. DOI: 10.19666/j.rlfd.2000.03.010.

  •  
  •  

0

Views

52

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization and analysis of cold-end system in thermal power units
SOME MEASURES FOR ENHANCING THE RELIABILITY OF FK SERIES FEED-WATER PUMPS FOR BOILERS IN POWER PLANTS
OPTIMAL CONDITIONS OF DUAL-PUMP OPERATION FOR CIRCULATING-WATER PUMPS
STUDY ON CATHODIC PROTECTION TECHNOLOGY FOR SHAFT OF CIRCULATING-WATER PUMPS IN SEASIDE POWER PLANTS
TECHNICAL RETROFIT FOR ENERGYSAVING OF 32SA19A TYPE CIRCULATING WATER PUMPS IN WENHULIANG POWERGENERATION COMPANY

Related Author

CHENG Haoran
ZENG Zhendong
ZHANG Li
LI Shaohua
MA Shanjun
XU Shui-xiang
刘树松
盛焕程

Related Institution

Shenzhen Synergy Power Co.
College of Energy and Mechanical Engineering, Shanghai University of Electric Power
North China Electric Power University
Shanghai Electric Power Maintenance Factory Co., Ltd.
0