您当前的位置:
首页 >
文章列表页 >
MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER
更新时间:2025-09-28
    • MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER

    • Thermal Power Generation   Issue 1, Pages: 59-61(2000)
    • DOI:10.19666/j.rlfd.2000.01.015    

      CLC: TK229
    • Published:2000

    移动端阅览

  • MODIFICATION OF INSULATION AND SEALING OF RUSSIA 230 t/h BOILER[J]. Thermal power generation, 2000, (1): 59-61. DOI: 10.19666/j.rlfd.2000.01.015.

  •  
  •  

0

Views

85

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER
Structure optimization for pulverized coal mixer of a 300 MW unit boiler
Operation adjustment for high temperature corrosion in water wall of supercritical opposed firing boiler
Effect of coal type on oxygen-enriched combustion boiler based on entropy analysis
Research on main and reheat steam temperature lifting method for ultra supercritical 1 000 MW unit double-tangential circular boiler

Related Author

ZOU Hai-feng1
LI Ying21.School of Business Administration
ZHU Zhaoyang
ZHOU Fei
MU Weifu
JI Haimin
ZHOU Ping
LU Fen

Related Institution

School of Business Administration, North China Electric Power University
Shenhua Guohua (Beijing) Electric Power Research Institute
Fengtai Power Generation Co., Ltd., Fengtai
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Liaocheng Thermal Power Generation Co., Ltd.
0