您当前的位置:
首页 >
文章列表页 >
国产引进型300MW机组甩负荷试验探讨
更新时间:2025-09-28
    • 国产引进型300MW机组甩负荷试验探讨

    • Thermal Power Generation   Issue 6, Pages: 45-46(1999)
    • DOI:10.19666/j.rlfd.1999.06.015    

      CLC: TM311
    • Published:1999

    移动端阅览

  • [J]. Thermal power generation, 1999, (6): 45-46. DOI: 10.19666/j.rlfd.1999.06.015.

  •  
  •  

0

Views

31

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT
STUDY ON PRBLEMS CONCERNING VIBRATION CLIMB AND INSTABILITY OF BEARING SHOES NO.6 AND NO.7 ON IMPORTED TYPE 300 MW UNITS
AN APPROACH TO CONDENSOR’S COOLING SURFACE OF HOME-MADE IMPORTED TYPE 300 MW STEAM TURBINE UNITS
CHARACTERISTICS ANALYSIS TO OVERSPEED LIMITING SYSTEM OF 700MW UNIT AT ZHUHAI POWER PLANT
RETROFIT AND ANALYSIS OF SERVOMOTOR IN SPEED-GOVERNING SYSTEM OF STEAM TURBINE FOR C50 TYPE UNIT

Related Author

陈勉
郑峰
康龙
吕学军
SHEN Peihua
YU Xin-ying
JU Wen-ping
YANG Shou-min

Related Institution

Shenyang Thermal Power Plant
Shuangliao Power Plant
Tongliao Power Plant
Jilin Shuangliao
0