您当前的位置:
首页 >
文章列表页 >
PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT
更新时间:2025-09-28
    • PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT

    • Thermal Power Generation   Issue 5, Pages: 36-39(1998)
    • DOI:10.19666/j.rlfd.1998.05.011    

      CLC: TK26
    • Published:1998

    移动端阅览

  • PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT[J]. Thermal power generation, 1998, (5): 36-39. DOI: 10.19666/j.rlfd.1998.05.011.

  •  
  •  

0

Views

83

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Overall economical performance of 1 000 MW class ultra-supercritical unit with double-reheat cycle
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
Evaluation methods for turbine steam seal retrofitting
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Simplified calculation method for economical indexes of heating units

Related Author

YAO Xiaolin
FU Chang
SHI Yanzhou
MENG Guixiang
WANG Anqing
LIU Zhicheng
WU Tao
CHU Mo

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
Xi’an Electric Power College
0