PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT[J]. Thermal power generation, 1998, (5): 36-39.
DOI:
PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT[J]. Thermal power generation, 1998, (5): 36-39. DOI: 10.19666/j.rlfd.1998.05.011.
PERFORMANCE OF THE REPLACED LP TURBINE OF AN IMPORTED SUPERPRESSURE TURBINE UNIT IN SHIDONGKAO POWER PLANT
A verification performance test is conducted on a 600MW superpressure turbine in Shidongkao power plant in accordancewith "ASME PTC6-1976. "The valve point basis was adopted for test basis. During data calculation correction was made toparameters and for equipment ageing. Based on the test results the turbine performance was analyzed.