EXPERIMENTAL STUDY ON VERIFICATION OF RETROFITTING MODIFICATION OF LP FURBINE FLOW PATH
更新时间:2025-09-28
    • EXPERIMENTAL STUDY ON VERIFICATION OF RETROFITTING MODIFICATION OF LP FURBINE FLOW PATH

    • Thermal Power Generation   Issue 5, Pages: 22-26(1998)
    • DOI:10.19666/j.rlfd.1998.05.007    

      CLC: TK26
    • Published:1998

    移动端阅览

  • EXPERIMENTAL STUDY ON VERIFICATION OF RETROFITTING MODIFICATION OF LP FURBINE FLOW PATH[J]. Thermal power generation, 1998, (5): 22-26. DOI: 10.19666/j.rlfd.1998.05.007.

  •  
  •  

0

Views

75

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Progress of quantitative evaluation of wetness losses in steam turbine
ANALYSIS AND EVALUATION OF TECHNICAL RETROFITTING FOR FLOW PASSAGE PART OF 100MW TURBINE AT QINGSHAN THERMAL POWER PLANT
RETROFIT OF STEAM TURBINE FOR CAPACITY-UPGRADING AND EFFICIENCY-ENHANCING IN THERMAL POWER PLANT UNDER QILU PETRO-CHEMICAL CORP
CAUSE ANALYSIS OF BLADE BREAKAGE IN LOWPRESSURE CYLINDER OF C50-90/13 TYPE STEAM TURBINE AND COMPARISON OF RESOLVING COUNTERMEASURES THEREOF
RETROFIT OF LOW-PRESSURE CASING'S FLOW PASSAGE FOR 200 MW STEAM TURBINES IN SHAOGUANG POWER PLANT

Related Author

HAN Zhonghe
HAN Xu
LI Peng
宋少华
黄树红
肖建明
刘俊忠
孙玉忠

Related Institution

Key Lab of Condition Monitoring and Control for Power Plant Equipment,Ministry of Education,North China Electric Power University
Huazhong University of Science and Technology
Qingshan Thermal Power Plant
Qilu Petrochemical Company Thermal Power Plant