您当前的位置:
首页 >
文章列表页 >
STUDY ON THERMAL ECONOMY OF THERMAL AND ELECTRICAL LOAD DISTRIBUTION BETWEEN 200MW UNITS IN CHANGCHUN POWER PLANT WITH DISTRICT HEATING
更新时间:2025-09-28
    • STUDY ON THERMAL ECONOMY OF THERMAL AND ELECTRICAL LOAD DISTRIBUTION BETWEEN 200MW UNITS IN CHANGCHUN POWER PLANT WITH DISTRICT HEATING

    • Thermal Power Generation   Issue 4, Pages: 28-30(1998)
    • DOI:10.19666/j.rlfd.1998.04.006    

      CLC: TM621
    • Published:1998

    移动端阅览

  • STUDY ON THERMAL ECONOMY OF THERMAL AND ELECTRICAL LOAD DISTRIBUTION BETWEEN 200MW UNITS IN CHANGCHUN POWER PLANT WITH DISTRICT HEATING[J]. Thermal power generation, 1998, (4): 28-30. DOI: 10.19666/j.rlfd.1998.04.006.

  •  
  •  

0

Views

101

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

THE INFLUENCE OF CIRCULATORY WATER′S TEMPERATUER RAISE UPON UNIT′S ECONOMIC ASPECT AND COUNTERMEASURES THERSOF
ANALYSIS OF THERMAL ECONOMIC BEHAVIOR FOR ADOPTING COOL-ELETRICITY CO-GENERATION TO 300 MW EXTRACTION CONDENSING UNIT
Analysis on energy saving potentials of overheat recovery of steam extractions for double-reheat power unit
Thermal-economic analysis for scheme of steam turbine generator placement in high and low platform separately
Thermal economy research for double-reheat unit equipped with heat recovery steam turbine

Related Author

杜增辉
叶晓东
FAN Jiang1
WANG Jin1
WANG Yu2 (1.Taiyuan University of Science and Technology
LIU Ming
ZHAO Yongliang
WANG Chaoyang

Related Institution

Thermal Power Plant of Karamay Petrochemical Plant
Karamay Petrochemical Plant Thermal Power Plant Karamay
Taiyuan University of Technology
Datong Second Power Plant
0