ANALYSIS ON BY-PASS SYSTEM OF 300MW TURBINES MANUFACTURED WITH FOREGN LICENCE
摘要
通过调查研究
对引进型 3 0 0MW机组旁路系统的设计、运行方式进行了分析
并对其设置的必要性提出了建议。综合分析结果表明
引进型 3 0 0MW机组旁路系统仅能实现汽轮机冲转前的启动功能
有不再设置旁路的可能。
Abstract
Based on investigation
an analysis was made on the design and operation mode of a bypass system of 300MW turbine manufactured with forgign licence It shows that this bypass system only has the function of startup before turbine run-up. It may not be necessary to use such bypass system.