您当前的位置:
首页 >
文章列表页 >
THERMAL STRESS EXPECTATION OF A CZECH-MADE 500 MW TURBINE IN SHENTOU POWER PLANT
更新时间:2025-09-28
    • THERMAL STRESS EXPECTATION OF A CZECH-MADE 500 MW TURBINE IN SHENTOU POWER PLANT

    • Thermal Power Generation   Issue 3, Pages: 21-25(1998)
    • DOI:10.19666/j.rlfd.1998.03.005    

      CLC: TK12
    • Published:1998

    移动端阅览

  • THERMAL STRESS EXPECTATION OF A CZECH-MADE 500 MW TURBINE IN SHENTOU POWER PLANT[J]. Thermal power generation, 1998, (3): 21-25. DOI: 10.19666/j.rlfd.1998.03.005.

  •  
  •  

0

Views

61

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Operating state and fatigue life evaluation of boiler steam drum for domestic first set of 9F gas turbine units
CAUSE ANALYSIS AND REMEDICAL MEASURES FOR BURN-OUT FAILURE OF FAN'S DUALSUPPORT BEARING DUE TO HEATING IN YUNFU POWER PLANT
TEMPERATURE FIELD AND THERMAL STRESS FINITE ELEMENT ANALYSIS OF A 50MW STEAM TURBINE'S CYLINDER IN A POWER PLANT
STRENGTH ANALYSIS OF CRACKED PART ON CYLINDER WALL IN STEAM TURBINE
SELFCLEARING OF SLAG IN FURNACE FOR THE COALFIRED BOILERS

Related Author

ZHOU Jianguang
WU Yongzhong
CHEN Qiuhui
SHI Zhigang
LAI Xinhua
CAI Hui
ZENG De-qi
陈聪智

Related Institution

Shenzhen Guangqian Electric Power Co.,Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
Yunfu Power Plant Guangdong Yunfu
Baoji Power Plant Xi'an
0