您当前的位置:
首页 >
文章列表页 >
CALCULATION IMPROVEMENT OF DISTRICT HEAING/ELECTRICITY GENERATION RATIO OF A COGENERATION POWER PLANT
更新时间:2025-09-28
    • CALCULATION IMPROVEMENT OF DISTRICT HEAING/ELECTRICITY GENERATION RATIO OF A COGENERATION POWER PLANT

    • Thermal Power Generation   Issue 4, Pages: 42-43(1997)
    • DOI:10.19666/j.rlfd.1997.04.010    

      CLC: TK11
    • Published:1997

    移动端阅览

  • CALCULATION IMPROVEMENT OF DISTRICT HEAING/ELECTRICITY GENERATION RATIO OF A COGENERATION POWER PLANT[J]. Thermal power generation, 1997, (4): 42-43. DOI: 10.19666/j.rlfd.1997.04.010.

  •  
  •  

0

Views

146

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dynamic environmental assessment for natural gas cogeneration systems based on supply-demand coupling analysis
大型火力发电机组煤耗分析
ANALYSIS OF ENHANCING THE COMPREHENSIVE BENEFITS FOR LOCAL THERMAL POWER ENTERPRISES
ENERGYSAVING ANALYSIS OF APPLYING LITHIUM BROMIDE ABSORBING TYPE REFRIGERATING MACHINE INTO HEAT AND ELECTRICITY COGENERATION UNIT
AN APPROACH TO PROBLEMS MAY EXISTING IN RETROFITTING 300 MW CONDENSING UNIT INTO HEAT-SUPPLYING UNIT IN QINHUANG DAO POWER PLANT

Related Author

WU Qiong
LU Yinlong
REN Hongbo
续爱世
付弢
杨杰
夏明
王武林

Related Institution

College of Energy and Mechanical Engineering, Shanghai University of Electric Power
山西太原030001
Shanxi Academy of Electric Power Sciences
Shanxi Electric Power Academy
Taizhou Vocational and Technical College, Taizhou Economic Commission, Taizhou, Jiangsu 225300, Taizhou, Jiangsu 225300
0