您当前的位置:
首页 >
文章列表页 >
TUBE FAILURE ANALYSIS OF LP FEEDHEATER PROVIDED WITH 350MW TURBINE UNIT IMPORTED FROM JAPAN
更新时间:2025-09-28
    • TUBE FAILURE ANALYSIS OF LP FEEDHEATER PROVIDED WITH 350MW TURBINE UNIT IMPORTED FROM JAPAN

    • Thermal Power Generation   Issue 3, Pages: 29-31(1997)
    • DOI:10.19666/j.rlfd.1997.03.009    

      CLC: TM621
    • Published:1997

    移动端阅览

  • TUBE FAILURE ANALYSIS OF LP FEEDHEATER PROVIDED WITH 350MW TURBINE UNIT IMPORTED FROM JAPAN[J]. Thermal power generation, 1997, (3): 29-31. DOI: 10.19666/j.rlfd.1997.03.009.

  •  
  •  

0

Views

28

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ENHANCEMENT OF SAFETY AND ECONOMIC ASPECT FOR HEAT REGENERATIVE SYSTEM OF AN IMPORTED TYPE 300MW UNIT
APPLICATION OF FLOW - REFRACTING STEM HEAT EXCHANGER IN HEAT REGENERATION SYSTEM OF THERMAL POWER PLANT
CAUSE ANALYSIS OF DRAIN BLOCKAGE FOR LOWPRESSURE HEATERS NO.7 AND 8 OF 300 MW UNIT
Factors affecting the service life of filter bag
APPLICATION OF FREQUENCY-CONVERTING TECHNOLOGY ON DRAIN PUMP FOR LP HEATER OF A 300MW UNIT

Related Author

ZHANG Cun-sheng
李权
叶加贵
黄素逸
赖学江
王宏强
李献荣
李洪海

Related Institution

The Pearl River Power Plant Guangzhou
Zhanjiang Ocean University
Huazhong University of Science and Technology
Maoming Maogang Power Equipment Factory
0