您当前的位置:
首页 >
文章列表页 >
A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices
Power Grid Operation | 更新时间:2025-06-16
    • A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices

    • ZHEJIANG ELECTRIC POWER   Vol. 44, Issue 1, Pages: 24-33(2025)
    • DOI:10.19585/j.zjdl.202501003    

      CLC:
    • Received:25 June 2024,

      Revised:2024-08-29,

      Published:25 January 2025

    移动端阅览

  • WU Ying,WANG Juefei,LI Junjie,et al.A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices[J].ZHEJIANG ELECTRIC POWER,2025,44(01):24-33. DOI: 10.19585/j.zjdl.202501003.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal scheduling of WPLSH flexibility resources based on chance constraints
Optimal scheduling of smart building microgrids based on AQPSO
A DRL-based optimization method for microgrid operation
Coordinated optimal scheduling of island microgrid for power-hydrogen-carbon integration based on SAO-NSGA-II algorithm
An optimal scheduling method for port integrated energy system considering ship demand response at multiple time scales

Related Author

XING Haijun
MIAO Qiuyuan
WANG Jianhui
ZHANG Yuhua
DU Jiawei
XU Dong
LI Yichao
YE Aoshuang

Related Institution

School of Electrical Engineering, Shanghai University of Electric Power
Shanghai University of Electric Power
State Grid Pudong Power Supply Company
School of Electrical Engineering, Southeast University
Guodian Nanjing Automation Co., Ltd.
0