Qinghai-Henan UHV transmission project is the first line in China to transmit renewable energy mainly. In order to adapt to clean energy delivery and improve system reliability
the overall design
equipment manufacturing
and control and protection strategy of the Qinghai-Henan UHV transmission project are optimized and upgraded. In this study
typical methods for design priority
main equipment reliability improvement
control and protection strategy optimization
and the next-generation synchronous condenser. The project commissioning and live operation shows that the aforementioned methods have achieved remarkable results in enhancing system reliability and helping renewable energy transmission.