Distributionally Robust Optimization Based Restoration for Integrated Electricity-Gas Systems Incorporating Wind Power and Flexible Reserve Capacity Allocations
Regular Papers|更新时间:2026-10-15
|
Distributionally Robust Optimization Based Restoration for Integrated Electricity-Gas Systems Incorporating Wind Power and Flexible Reserve Capacity Allocations
CSEE Journal of Power and Energy SystemsVol. 11, Issue 4, Pages: 1770-1785(2025)
作者机构:
1. Department of Electrical Engineering, Key Laboratory of Control of Power Transmission and Conversion of Ministry of Education, Shanghai Jiao Tong University
2. College of Information Science and Technology, Donghua University,Shanghai,China
Jingyang Yun, Hongyan Ma, Zheng Yan. Distributionally Robust Optimization Based Restoration for Integrated Electricity-Gas Systems Incorporating Wind Power and Flexible Reserve Capacity Allocations[J]. CSEE Journal of Power and Energy Systems, 2025, 11(4): 1770-1785.
DOI:
Jingyang Yun, Hongyan Ma, Zheng Yan. Distributionally Robust Optimization Based Restoration for Integrated Electricity-Gas Systems Incorporating Wind Power and Flexible Reserve Capacity Allocations[J]. CSEE Journal of Power and Energy Systems, 2025, 11(4): 1770-1785.DOI: 10.17775/CSEEJPES.2021.01650.
Distributionally Robust Optimization Based Restoration for Integrated Electricity-Gas Systems Incorporating Wind Power and Flexible Reserve Capacity Allocations
摘要
Abstract
The integrated electricity-gas system (IEGS) is the foundation of the Energy Internet. As inevitable risk factors
the widespread blackout and large-scale energy supply disruptions represent serious threats to the IEGS. Improving the load restoration ability of IEGS is an important measure to mitigate the harm caused by blackouts. However
the increasing penetration of wind power has posed some difficulties to IEGS load restoration. In view of this
based on distributionally robust optimization (DRO)
a two-stage IEGS restoration model is developed in this paper. Through a detailed mathematical model of an electric power system (EPS) with multiple generating resources and a natural gas system (NGS) with dynamic characteristics
the supporting role of the NGS operation flexibility for IEGS restoration is fully explored and quantitatively analyzed. Through the construction of a Wasserstein metric-based ambiguity set of wind power forecast deviation
the proposed two-stage IEGS restoration model can incorporate operational risks when the uncertainty of wind power output is encountered and also take into account the flexible reserve capacity (FRC) allocation and deployment constraints. The proposed model can realize the reasonable scheduling of wind power
automatically determine the allocation of the required FRC
and optimize the load restoration schemes. Moreover
the proposed model can be converted into a mixed integer linear programming problem which can be directly solved. In the case study
the advantages of the proposed model are compared with three conventional restoration models based on two test systems