Jisong Zhu, Baike Chen, Tianyao Ji, et al. Transitional Revenue Scheme for High-cost Generator Unit in Guangdong Electricity Market Based on Government Authorized Contracts[J]. CSEE Journal of Power and Energy Systems, 2024, 10(1): 208-221.
DOI:
Jisong Zhu, Baike Chen, Tianyao Ji, et al. Transitional Revenue Scheme for High-cost Generator Unit in Guangdong Electricity Market Based on Government Authorized Contracts[J]. CSEE Journal of Power and Energy Systems, 2024, 10(1): 208-221.DOI: 10.17775/CSEEJPES.2020.03040.
Transitional Revenue Scheme for High-cost Generator Unit in Guangdong Electricity Market Based on Government Authorized Contracts
High-cost generator units are at a cost disadvantage in electricity spot markets. This study focuses on revenue mechanisms of gas-fired units affected by power market reform in Guangdong province
China. For the first time
we compare impacts on market indicators of five settlement mechanisms: feed-in tariff (FiT)
location marginal price (LMP)
contract for difference (CFD)
direct subsidy (DS)
and estimated revenue method (ERM). In particular
we design key parameters
including authorized CFD and ERM of two kinds of government authorized contracts based on traditional dispatching patterns to avoid significant profit fluctuations brought by market reforms. We also analyze impact of factors such as climbing performance
seasonal load
and subsidy amount on the overall market and its players. Results of a case study show to directly subsidize gasfired units will lead higher-cost units to generate more electricity
with a resulting loss of social welfare. Disruption of market prices and provision of unreasonable incentives are fatal disadvantages of this subsidy method. The government and policymakers should consider financial means to adjust benefits to reduce production costs and increase social welfare. Also
by case analysis
the ERM shows its stable performance in revenue of high-cost units
while we find that authorized CFD is not applicable for gas-fired units whose output is unstable as a marginal unit frequently. Therefore
we suggest government agencies adopt ERM to sign contracts with gas-fired units
to attain a balance between fairness and efficiency.
关键词
Keywords
references
11. Public notice about feed-in tariff adjustment of gas generator unit . [Online ] . Available: http://www.zj.gov.en/art/2018/5/7/art_13929_297542.html
12. Notice about gas power feed-in tariff management . [Online ] . Available: http://www.jsea.org.cn/end.asp?Id=1858
13. Notice about the optimization of the gas power feed-in tariff adjustment mechanism . [Online ] . Available: http://fgw.sh.gov.cn/xxgk/cxxxgk/36391.htm
15. Ontario Power Authority. CHP standard offer programcontract . [On line ] . Available: http://www.ieso.ca/Sector-Participants/Energy-Procurement-Programs-and-Contracts/Combinen-Heat-and-Power
25. National Energy Administration. ( 2011 ). Energy-saving power generation dispatching pilot plan and the detailed rules for the implementation . [Online ] . Available: http://www.nea.gov.cn/2011-11/22/c_131262571.htm3.
27. The General Office of State Council. Open, just and fair power dispatching . [Online ] . Available: http://www.gov.cn/ztzl/2006–07/01/contenC324604.htm