您当前的位置:
首页 >
文章列表页 >
双江口水电站地下厂房预应力锚索布置优化
更新时间:2025-10-29
    • 双江口水电站地下厂房预应力锚索布置优化

    • Issue 1, Pages: 73-76(2025)
    • DOI:10.16671/j.cnki.cn51-1382/tv.2025.01.002    

      CLC: TV731+.6
    • Published:2025

    移动端阅览

  • [J]. 2025, (1): 73-76. DOI: 10.16671/j.cnki.cn51-1382/tv.2025.01.002.

  •  
  •  

0

Views

46

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

某水电站压力管道弯段结构方案对比分析
叶巴滩水电站出线竖井开挖支护施工技术研究
Stability Criteria for Surrouding Rock and Support Dynamic System——Deformation Rate Ratio Distinguishing Method
Rock Anchor Beam Construction Technology of Dachaoshan Hydroelectric Plant
Commentary on Engineering Geology Condition of Punglung Hydroelectric Plant in Burma

Related Author

蒙富强
汪卓
羊栖均
钟富林
汪卓
Li Shihui
ZHOU Jian-ping~1
ZHANG Xiao-song~2

Related Institution

华电金沙江上游水电开发有限公司叶巴滩分公司
  北京 100029  
The 4th Design and Research Institute,Department of the Engineer Corps,HQ, of the General staff of PLA
中国水电顾问有限公司!北京100011中南勘测设计研究院
South and Central China Investigation and Design Institute,State Power Company
0