Due to the unclear value requirements for air striking distance between lightning protection towers and protected equipment in the regulations
there is often excessive margin in the actual power transformation projects. Firstly
based on the analysis of the factors affecting impulse grounding resistance and the lightning diversion effect of lightning protection lines
the probability method based on lighting safe operation years in substation is adopted
and according to the layout of substations
the actual annual lightning stroke probability is compared to determine the critical lightning stroke probability of air striking distance of lightning protection towers. Secondly
the amplitude of the corresponding critical lightning current is obtained through the probability distribution
and
based on the simplified transient potential model of lightning protection towers and breakdown field
a simplified calculation method for determining the air striking distance between lightning protection towers and protected equipment is obtained. Finally
based on actual substation cases
the calculation is carried out
the corresponding simplified calculation formula is proposed and the influence of air clearance on the electrical layout of substations is analyzed.