您当前的位置:
首页 >
文章列表页 >
Economic Analysis of Offshore Wind Power in Grid Parity Stage in Guangdong Province
更新时间:2025-10-22
    • Economic Analysis of Offshore Wind Power in Grid Parity Stage in Guangdong Province

    • Southern Energy Construction   Vol. 12, Issue 5, Pages: 100-107(2025)
    • DOI:10.16516/j.ceec.2025-236    

      CLC: TK89;TM614
    • Published:2025

    移动端阅览

  • . DOI: 10.16516/j.ceec.2025-236.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Scheme Design of Offshore Wind Power Intelligent Maintenance and Repair Platform
Large Diameter Monopile Pile-Soil Interaction in Sandy Seabed
Carbon Reserve and Carbon Sink Potential Estimation of Mangrove in Guangdong Province
Application Practice of 5G Customized Network Technology in Intelligent Management and Ecological Environment Monitoring of Offshore Wind Farm
Pile Driving Construction Process and Application of Offshore Wind Turbine Monopile Foundation

Related Author

Yuan YANG
Can ZHENG
Zhentao LIU
Kan LIAO
Youhu ZHANG
Siqi SU
Guanhua ZOU
Yunjun YU

Related Institution

School of Civil Engineering, Southeast University
South China Institute of Environmental Science, Ministry of Ecology and Environment
Guangdong Telecom Planning and Design Institute Co., Ltd.
Guangdong Provincial Key Laboratory of Advanced Manufacturing Technology for Marine Energy Facilities, CRCC Harbour & Channel Engineering Bureau Group Co., Ltd.
Guangdong Provincial Key Laboratory of Advanced Manufacturing Technology for Marine Energy Facilities, School of Electro-Mechanical Engineering, Guangdong University of Technology
0