您当前的位置:
首页 >
文章列表页 >
A Dynamic Scheduling Planning Method for Offshore Wind Farm Operation and Maintenance Tasks Based on Multi-Objective Optimization
更新时间:2026-02-28
    • A Dynamic Scheduling Planning Method for Offshore Wind Farm Operation and Maintenance Tasks Based on Multi-Objective Optimization

    • Southern Energy Construction   Vol. 13, Issue 1, Pages: 37-47(2026)
    • DOI:10.16516/j.ceec.2024-392    

      CLC: TK89;TP181;TM614
    • Published:2026

    移动端阅览

  • . DOI: 10.16516/j.ceec.2024-392.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Development Status, Problems and Prospects of Offshore WindHydrogen Production Industry in China
Model Establishment and Power Optimization of Vertical Gravity Energy Storage System
Processing method of CR image based on fuzzy set theory
Analysis of the imaging characteristics and scanning traces of the 45? rotating scanning mirror
Flatness evaluation based on real-coded genetic algorithm

Related Author

Zier JIN
Ziyuan WANG
Yajie LI
Ying WANG
Jialuan ZHANG
Xueluan CHEN
Lingjie DUAN
LIU Weimin

Related Institution

Guangdong Energy Research Society
Guangdong R & D Center for Technological Economy
China Shipbuilding Group Wind Power Development Co., Ltd.
Foshan Institute of Environment and Energy Technology
School of Electrical Engineering, Beijing Jiaotong University
0