SONG Lin-hui, ZHANG Jing-xuan, GUO Yi-long, et al. Measurement and analysis of pore pressure at the base of
subway stations in fractured rock layers[J]. 2026, 47(4): 1364-1372.
DOI:
SONG Lin-hui, ZHANG Jing-xuan, GUO Yi-long, et al. Measurement and analysis of pore pressure at the base of
subway stations in fractured rock layers[J]. 2026, 47(4): 1364-1372.DOI: 10.16285/j.rsm.2025.0305.
Measurement and analysis of pore pressure at the base of
subway stations in fractured rock layers
The geotechnical issues arising from the large-scale development of underground spaces
primarily driven by urban rail transit
are becoming increasingly prominent. One of the key issues is the anti-floating performance of subway station structures. Based on the subway station project
a monitoring plan has been developed. Water-level and meteorological monitoring points were established around the site. Pore-pressure sensors were installed at the base of the station to enable real-time monitoring for two years. Pore-pressure
on-site water level
and rainfall data have been collected for the entire period from construction to operation. Moreover
the variations in pore pressure and their influencing factors were analyzed. The test and analysis results indicate that the pore pressure at each point of the base dynamically changes and responds promptly to dewatering and rainfall. Dewatering can effectively reduce the pore pressure of the foundation. The pore pressure will increase after stopping dewatering in local area
with a maximum growth value of 76.8 kPa and a maximum growth rate of 213%. The growth value and growth rate of pore pressure are closely related to the depth
distance to the monitoring area
and amount of water in the area where dewatering is stopped
and the distance has the greatest impact
followed by the amount of water to be stopped. Rainfall will increase the pore pressure
and the increase in pore pressure caused by moderate to heavy rainfall is greater than 0.04 kPa/mm. Moreover
the increase in water level and pore pressure after rainfall will lag behind by 4 to 5 hours. The average pore pressure ratio during subway operation varies between 0.84 and 0.96
with higher values during the wet season. The pore pressure test values are basically equal to the static water pressure values. It is necessary to set a safety factor of 1.05 in anti-floating design. The research results can provide reference for subway station construction and anti-floating design.