MA Xue-ning, WANG Le, BAI Fan, et al. Passive soil arching effect in front of piles in embedded section of existing-new side-by-side composite pile-sheet wall[J]. 2025, 46(12): 3899-3912.
DOI:
MA Xue-ning, WANG Le, BAI Fan, et al. Passive soil arching effect in front of piles in embedded section of existing-new side-by-side composite pile-sheet wall[J]. 2025, 46(12): 3899-3912.DOI: 10.16285/j.rsm.2025.0005.
Passive soil arching effect in front of piles in embedded section of existing-new side-by-side composite pile-sheet wall
This study uses the composite pile-sheet wall introduced into the Lanzhou hub project by the Zhongwei–Lanzhou passenger dedicated line as the research object
and employs a combined field monitoring and numerical simulation approach to systematically investigate the passive soil-arch effect in front of piles in the embedded section of the existing–new side-by-side pile-sheet wall. Field monitoring yields measurements of pile deformation
bending moment
and soil pressure in front of the new pile
and a three-dimensional finite element (FE) model is constructed for comparative verification. Based on the numerical simulation results
an in-depth analysis is conducted of the formation mechanism
evolution
geometric characteristics
and spatial configuration of the passive soil arch in front of the composite pile-sheet wall. The results show that the contact soil pressure in front of both the existing and the new piles follows a parabolic distribution
with larger values near the surface and smaller values at depth. Under embankment widening and train loading
the increase in contact soil pressure in front of the existing piles is smaller than that in front of the new piles. As the loads on the new pile increase
both piles experience greater displacements
creating a substantial displacement difference with the soil between them. This causes the principal-stress direction in the inter-pile soil to deviate and leads to the formation of a passive soil arch in front of both the existing and the new piles. The evolution of the passive soil arch can be divided into the following stages. Under the load from the existing embankment
a stable soil arch forms in front of the existing pile. The stress relief caused by excavating the new pile holes is limited in extent
and the soil arch in front of the existing piles remains intact. With the increase of new load
the stress of the soil in front of the new and the existing piles overlaps
resulting in stress redistribution. The original soil arch in front of the existing pile disappears
and a new passive soil arch forms progressively between the new and existing piles. Before and after the embankment widening
as the load increases
the thickness of the passive soil arch remains relatively constant
but the rise-span ratio gradually increases. Under the same working conditions
the soil arch thickness and the rise-span ratio decrease with increasing burial depth. The research results can provide reference for the design and construction of new composite pile-sheet wall.