您当前的位置:
首页 >
文章列表页 >
Long sequence time series model to predict uplift of segmental lining in shield tunnel based on LightGBM-Informer
更新时间:2026-06-25
    • Long sequence time series model to predict uplift of segmental lining in shield tunnel based on LightGBM-Informer

    • Vol. 45, Issue 12, Pages: 3791-3801(2024)
    • DOI:10.16285/j.rsm.2024.0256    

      CLC: U455.43
    • Online First:05 December 2024,

      Published:2024

    移动端阅览

  • ZHEN Jia-jie, LAI Feng-wen, HUANG Ming, et al. Long sequence time series model to predict uplift of segmental lining in shield tunnel based on LightGBM-Informer[J]. 2024, 45(12): 3791-3801. DOI: 10.16285/j.rsm.2024.0256.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

467

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Calculation of uplift deformation during shield tunnel excavation based on a short beam-spring model
Intelligent geological condition recognition in shield tunneling via time-series clustering and online learning
Shield-soil interaction model and numerical solution methodology considering active articulation system
Deformation effect on existing tunnels overlapped by new tunnel in lower-region
Analysis of dynamic response of shield tunnel to explosion seismic wave

Related Author

LI Wen-bo
GAN Xiao-lu
LIU Nian-wu
WU Hao
SHEN Shan-shan
LAI Feng-wen
HUANG Ming
LIAO Qing-xiang

Related Institution

School of Civil Engineering and Architecture, Zhejiang Sci-Tech University
College of Transportation and Civil Engineering, Fujian Agriculture and Forestry University
Fujian Fuzhou Construction Development Group Co. Ltd.
Xiamen Engineering Co. Ltd. of CCCC First Highway Engineering Co. Ltd.
China Construction Fourth Engineering Division Co. Ltd.
0