HAN Xiao-yu, ZHENG Wei-feng, DONG Zhi-hong, et al. Comprehensive testing and analysis of crack resistance in high-head pumped storage power stations[J]. 2024, 45(7): 2167-2174.
DOI:
HAN Xiao-yu, ZHENG Wei-feng, DONG Zhi-hong, et al. Comprehensive testing and analysis of crack resistance in high-head pumped storage power stations[J]. 2024, 45(7): 2167-2174.DOI: 10.16285/j.rsm.2023.1269.
Comprehensive testing and analysis of crack resistance in high-head pumped storage power stations
The accelerated construction of pumped storage power stations underscores the importance of reasonable arrangement in-situ stress testing and precise data acquisition for high-head pumped storage power stations. This study
taking a high-head pumped storage power station as an example
conducted comprehensive in-situ stress measurements across various survey stages
considering the topographic and in-situ stress characteristics. By integrating in-situ stress field inversion
we obtained the spatial three-dimensional in-situ stress field distribution and analyzed the anti-splitting properties of the surrounding rock. The comprehensive measurements revealed that the two-dimensional surface deep hole results vary with the buried depth gradient
exhibiting stress concentration in the middle and shallow regions
aligning with the in-situ stress distribution patterns of high-head pumped storage power stations. The maximum measured principal stress in the underground plant and high-pressure bifurcation pipe reached 20.9 MPa
while the minimum principal stress was 7.0 MPa
indicating that horizontal stress is the dominant stress in the rock mass. The maximum principal stress direction is concentrated towards the NEE orientation. The inversion of the initial in-situ stress field can be carried out by using the comprehensive measured results to strengthen the refinement of the model
which can better reflect the characteristics of the in-situ stress field of such projects
and is conducive to the anti-splitting analysis of the surrounding rock and the selection of subsequent lining schemes. This study demonstrates the feasibility of comprehensive in-situ stress testing for high-head pumped storage projects
providing a valuable reference for in-situ stress investigations in such power station projects.