您当前的位置:
首页 >
文章列表页 >
Calculation of uplift capacity of steel pipe pile with constrained grouting
更新时间:2026-06-25
    • Calculation of uplift capacity of steel pipe pile with constrained grouting

    • Vol. 45, Issue 3, Pages: 846-856(2024)
    • DOI:10.16285/j.rsm.2023.0456    

      CLC: TU473.1
    • Online First:20 March 2024,

      Published:2024

    移动端阅览

  • WANG Chang-hong, YANG Tian-xiao, MA Cheng-tao, et al. Calculation of uplift capacity of steel pipe pile with constrained grouting[J]. 2024, 45(3): 846-856. DOI: 10.16285/j.rsm.2023.0456.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

129

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Calculation of uplift capacity of grouting-screw pile in soft clay area
Characteristics and simplified calculation method of creep settlement of high fill foundation in mountain area
Test study of model pile in calcareous sands
Research on simplified structural calculation method for up bamboo-truncated tunnel portal
Uplift mechanism and calculation method of constrained grouting pile under disturbed conditions

Related Author

HU Yu-yin
HUANG Mao-song
LING Qiao-long
ZHANG Chen-rong
ZHAO Yun
CAO Guang-xu
SONG Er-xiang
MENG Qing-shan

Related Institution

Shanghai Construction(Group) General Co., Ltd.
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Civil Engineering Safety and Durability of China Education Ministry, Tsinghua University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0