LIU Dong, LIN Pei-yuan, LI Wei-ke, et al. Statistical evaluation of accuracy of cross-hole CT method
in identifying karst caves[J]. 2024, 45(3): 822-834.
DOI:
LIU Dong, LIN Pei-yuan, LI Wei-ke, et al. Statistical evaluation of accuracy of cross-hole CT method
in identifying karst caves[J]. 2024, 45(3): 822-834.DOI: 10.16285/j.rsm.2023.0424.
Statistical evaluation of accuracy of cross-hole CT method
in identifying karst caves
Karst geological hazards pose a significant challenge for the urban construction and underground space development and utilization in the Guangdong-Hong Kong-Macao Greater Bay Area
especially in Guangzhou and Shenzhen. Karst exploration generally involves identifying and assessing caves through a combination of drilling and geophysical information. In recent years
the cross-hole computed tomography (CT) geophysical method has been widely used in karst exploration in the Greater Bay Area due to its ease of operation and strong ability to obtain geological information. However
the accuracy of this method in identifying caves still needs to be quantitatively evaluated. This paper collected a large amount of data on karst drilling and exploration
and the accuracy of cross-hole CT karst identification was statistically analyzed using the model factor method. The results showed that this method could accurately detect the buried depth of the cave roof
floor and height
with an average error less than 5%. The predictive accuracy of the buried depths of the cave roof and floor has very low variability
only 5%
while the predictive accuracy of the cave height has medium variability
exceeding 35%. The accuracy stability of the cross-hole CT karst identification method is satisfactory and not affected by the factors such as CT method type
cave filling condition
emission and reception point distance
drilling type
cave roof thickness
drilling distance
and verification hole distance. This paper also conducted a simple correction of the current cross-hole CT method
which increased the average accuracy of the model by 4% and reduced the variability by 3% without increasing the computational complexity. Finally
the analysis confirmed that the model factors for predicting cave height follow a Weibull distribution. The research results can provide theoretical support for karst cave exploration and risk assessment in karst areas
Calculation method of sliding surface stress based on segmented sliding surface stress measurement system
Research on stability of tunnel surrounding rocks based on statistical analysis of on-site displacement monitoring data
Probabilistical distribution statistical analysis of Tianjin soft soil indices
Catastrophe mechanism and control technology of ground collapse induced by urban tunneling
Statistical regularity research of physical and mechanical indexes of clay
Related Author
CHEN Huai-lin
YANG Tao
RAO Yun-kang
ZHANG Zhe
WU Hong-gang
XIE Jiang-wei
TENG Han-qing
LIU da-gang
Related Institution
China Railway Academy Co., Ltd.
China Northwest Research Institute Co., Ltd., of CREC
State Key Laboratory of Intelligent Construction and Maintenance for Geotechnical and Tunnel Engineering under Extreme Environments, Southwest Jiaotong University
School of Civil Engineering, Southwest Jiaotong University
The First Highway Survey and Design Institute of China Communitions