Control theory of gas blanket in energy storage salt cavern construction with nitrogen dissolution inhibition
Salt caverns have good stability and air-tightness
and thus are ideal places for storage of natural gas
oil
hydrogen
etc. The oil blanket used in the conventional salt caverns created by solution mining has problems such as poor dissolution inhibition effect and heavy oil contamination
which cannot meet the requirements of green mine construction. As a substitute
gas blanket has attracted much attention. However
its application is hindered due to great difficulty in control
and the complex geological conditions of salt rock strata in China. To this end
the characteristics of gas blanket control at different cavern construction stages were analyzed first
and then the methods for predicting the thickness of gas blanket and calculating the gas injection amount at different stages were proposed based on the analysis of the pressure balance at the gas-liquid interface. Combined with an example of a well in the groove construction period
the recommended thickness of gas blanket and its fluctuation range were given
and the variation law of the gas blanket thickness and the gas injection amount with the cavern construction progress was proved. Finally
the key problems related to the application of gas blanket were discussed. The results showed that the gas blanket thickness is mainly controlled during the groove construction and roof formation periods
and the gas-liquid interface position is mainly controlled during the cavern construction and cavern repair periods. It is suggested that the average gas blanket thickness during the groove construction period should not be less than 0.3 m. The thickness of gas blanket fluctuates rapidly at the beginning of the groove construction period
and thus a larger gas blanket thickness should be set up and the nitrogen should be replenished in time. Then the gas blanket thickness tends to be stable
and the gas replenishment interval can be gradually extended. With the increase of cavern construction time
the single gas replenishment volume becomes larger and larger
and the cumulative gas replenishment volume increases linearly as a whole. During cavern construction
the wellhead gas pressure and the gas pressure at the gas-liquid interface increase first and then decrease linearly
and the wellhead gas pressure change shall be monitored in real time. The cost of gas blanket is close to that of oil blanket
but the environmental benefits are significant
and the discharged nitrogen and wellhead gas injection facilities can be reused to save costs. The position of gas-liquid interface should be monitored on site in real time by combining optical fiber monitoring and neutron logging.