您当前的位置:
首页 >
文章列表页 >
多层互剪搅拌桩工法的工艺因素模型试验研究
更新时间:2026-06-28
    • 多层互剪搅拌桩工法的工艺因素模型试验研究

    • Vol. 45, Issue 1, Pages: 68-76(2024)
    • DOI:10.16285/j.rsm.2023.0072    

      CLC: TU473.1
    • Online First:10 January 2024,

      Published:2024

    移动端阅览

  • 葛春巍, 刘钟, 余桃喜, et al. 多层互剪搅拌桩工法的工艺因素模型试验研究[J]. 2024, 45(1): 68-76. DOI: 10.16285/j.rsm.2023.0072.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

13

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles
Nonlinear mechanical response of surrounding rock in compressed air energy storage cavern based on Hoek-Brown criterion
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns

Related Author

No data

Related Institution

No data
0