SUN Yan-xiao, LIU Song-yu, TONG Li-yuan, et al. Optimization of confined aquifer dewatering for cut and
cover tunnel in Yangtze River floodplain[J]. 2023, 44(6): 1800-1810.
DOI:
SUN Yan-xiao, LIU Song-yu, TONG Li-yuan, et al. Optimization of confined aquifer dewatering for cut and
cover tunnel in Yangtze River floodplain[J]. 2023, 44(6): 1800-1810.DOI: 10.16285/j.rsm.2022.1071.
Optimization of confined aquifer dewatering for cut and
cover tunnel in Yangtze River floodplain
dewatering scheme is typically designed using the method of theoretical calculation and numerical simulation. The designed scheme
however
is far from the optimum
since the total pumping rate can be further optimized with engineering safety ensured. Based on the dewatering in the 2nd confined aquifer of a cut and cover tunnel belonging to the north part of Jiangyin-Jingjiang Yangtze River tunnel project
dewatering optimization is conducted combining the methods of linear programming (LP) and numerical simulation. In advance
the hydraulic conductivity is adjusted by simulating the pumping test. Then
the parameters required in the LP model are obtained with numerical simulation. The pumping wells with optimal locations and the corresponding pumping rates are further determined
and the results are compared with the ones in actual construction. It is found that more number of pumping wells and more rational well location usually result in lower total pumping rate and drawdown. For the cut and cover tunnel with gradually changing excavation depths along the tunnel
dewatering in the deepest excavation zone shows the highest efficiency
since the dewatering requirements of the subsequent zones with lower excavation depths may be met simultaneously. The dewatering optimization can significantly reduce the number of activated pumping wells
Coupling mechanism of seepage and heat transfer in rock fracture based on physics-informed neural networks
Influence of construction gap on the force of steel lining in compressed air storage cavern
Stability and failure mode analysis of tunnel face in composite ground with upper sand and lower clay layers
Characterization method for the three-dimensional soil cutting failure surface based on damage energy dissipation
Pullout simulation on fully grouted rock bolts based on residual shear strength
Related Author
WANG Zhi-liang1
XIAO Zhi-huan1
SHEN Lin-fang1
LI Shao-Jun2
ZHANG Gui-min
SUN Wen-qing
ZHU Ze-fan
SU Yong-kang
Related Institution
Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Mechanics and Civil Engineering, China University of Mining and Technology
State Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology