您当前的位置:
首页 >
文章列表页 >
Refined analysis on stress state of cutoff wall of high asphaltic core dam on super-deep overburden
更新时间:2026-06-25
    • Refined analysis on stress state of cutoff wall of high asphaltic core dam on super-deep overburden

    • Vol. 44, Issue 6, Pages: 1826-1836(2023)
    • DOI:10.16285/j.rsm.2022.0985    

      CLC: TV223.4
    • Online First:17 June 2023,

      Published:2023

    移动端阅览

  • ZOU De-gao, QU Yong-qian, KONG Xian-jing, et al. Refined analysis on stress state of cutoff wall of high asphaltic core dam on super-deep overburden[J]. 2023, 44(6): 1826-1836. DOI: 10.16285/j.rsm.2022.0985.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

388

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of effect of canyon terrain on stress and displacement of cutoff wall in dam foundation with deep overburden
Numerical simulation for cutoff wall under backfilling construction of Daning reservoir
Effect of dynamic compaction vibration on cutoff wall and its safety monitoring
Density identification method of dam foundation deep overburden
Deformation behaviour of coarse grained materials under cyclic loading

Related Author

CAO Xue-xing
ZHOU Xiao-xi
HE Yun-long
PAN Ying
LIU Guang-ming、 YUAN Hong-hu、 HUANG Wei-hong、 LIU Miao、 WANG Zhi-yin、
SONG Quan-jie1
WANG Miao1
ZHOU Qing-chun1

Related Institution

HydroChina Corporation
Central and Southern China Municipal Engineering Design & Research Institute Co., Ltd.
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
The Office of the SNWDP Construction Commission in Beijing City
China Nuclear Power Engineering Co., Ltd.
0