Analytical method for surrounding rock reinforced by bolts-grouting
in tunnel under seepage
Bolts-grouting is a common reinforcement and waterproofing method in water-rich tunnel engineering. At present
there is still a lack of analytical theories that can simultaneously consider the mechanical interaction between rockbolt and surrounding rock
as well as the waterproof and impermeable effects of grouting. Based on Darcy’s law and "smeared" method
a differential equation of rock bolts-grouting composite surrounding rock was established by substituting the pore water pressure in the surrounding rock after grouting reinforcement and the interaction force between the rockbolt and the surrounding rock into the stress equilibrium equation of the reinforced surrounding rock. By solving the proposed differential equation
the closed-form solutions for pore pressure
displacement
and effective stress on bolts-grouting composite surrounding rock
and stress on the rockbolt are obtained and compared with numerical solutions and the solutions of other scholars. The comparison results show that the analytical results are consistent with the finite element solution; and bolts-grouting reinforcement can improve the stress state of surrounding rock compared with grouting only. Furthermore
based on our closed-form solutions
and the effect of bolts-grouting reinforcement parameters
support pressure
impermeability pressure of lining
and diameter of the tunnel on safety factor is elaborated. These laws indicate that with the increases of bolts-grouting range
rockbolts density factor and supporting pressure
the safety factor increases in the ways of first fast then slow
quasi-linear and first slow then fast
respectively. The increase of impermeability pressure on secondary lining can reduce the water inflow
but it is not conducive to the stability of the tunnel. Finally
based our closed-form solutions
we propose the method of parameter optimization for the bolts-grouting reinforcement in the tunnel as well as case study.