Model test on the deformation law of shield tunnel underpassing high
speed railway roadbed
The purpose of this paper is to investigate the effect of shield underpass construction on the deformation of the U-shaped trough structure and stratum of the high speed railway roadbed. The proposed Shijiazhuang rail transit line No.4 underpassing the Beijing-Shijiazhuang high-speed railway roadbed is selected as the engineering background. The stratum and structural model test materials are formulated based on the geometric similarity ratio
and the test monitoring system is designed. A 1 200 mm small shield is employed to carry out 2 sets of laboratory model tests for different distances from the vault of the shield tunnel to the bottom of pile in the roadbed. The results show that: with the increase of the distance from the shield tunnel vault
the settlement of the strata decreases
the influence range of the shield construction on the strata is about 2 times of the diameter of the tunnel
and the significant influence range is one time of the diameter of the tunnel; with the increase of the burial depth
the settlement of the strata under the structure caused by the shield construction decreases
and the maximum difference of settlement is 10% at the distance of 0.5 and 1.0 times of the diameter of the tunnel respectively from the shield tunnel vault; a dehiscence occurs between the U-shaped trough and the adjacent strata
and the percentage of settlement of the strata occurring during the shield tail release phase is greater than 74%. It is recommended to use grout filling material with good water retention and certain early strength after the completion of segment assembly to control the settlement deformation. Meanwhile
deep hole grouting should be carried out to timely fill loose ground pores so as to increase the compactness.
Influence of soil property on ground response during construction of shallow shield tunnel
An experimental study on the influence of synchronous grouting during shield tunnel construction on vertical displacement and surrounding earth pressure in sandy soil
Physical model test study of influence of advance of shield tunnel on adjacent underground pipelines
Calculation method of limit overlying earth pressure on shield tunnel during lifting
Sealing system design and model testing of lining structures for artificial underground gas storage caverns in medium-hard rock strata
Related Author
SONG Wei-tao
ZHANG Pei
DU Xiu-li
LIN Qing-tao
HUANG Da-wei
LU Wen-jian
LUO Wen-jun
YU Jue
Related Institution
School of Civil Engineering, Nanyang Institute of Technology
School of Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture
Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology
State Key Laboratory of Safety and Resilience of Civil Engineering in Mountain Area, East China Jiaotong University
Jiangxi Provincial Key Laboratory of Comprehensive Stereoscopic Traffic Information Perception and Fusion, East China Jiaotong University