Current theoretical studies of ground settlement induced by small radius curved tunnelling mostly consider the shield as a continuous whole and do not consider the effect of shield articulation. Therefore
the over-excavation gap caused by the change of excavation path of small curvature shield cannot be correctly evaluated. Firstly
based on the shield articulation position and the geometric position relationship between the shield and the small curvature tunnel excavation path
the calculation formulas were obtained for the over-excavation gap and articulated angle at different articulation positions of the shield machine during the excavation of the small curvature tunnel. Then
the mirror image method and Mindlin solution were used to solve the ground settlement caused by the combined effect of over-excavation ground loss
shield tail ground loss
excavation face uneven thrust
shield shell uneven friction and slurry pressure at the shield tail during articulated shield. Finally
engineering monitoring data were used to compare and verify with the theoretical solution of this paper
and good agreement was obtained. In addition
parametric analysis was carried out for the tunnel turning radius
front shield length
shield articulation angle and over-excavation gap. The analysis results show that ignoring the effect of shield articulation will overestimate the ground loss and result in large predictions of ground settlement. As the turning radius decreases
length of the front shield
shield articulation angle and over-excavation gap increases
the ground settlement increases
but the change of its value has a small effect on the settlement in front of the excavation face and a larger effect on the settlement behind the excavation face. Behind the excavation face
the longitudinal surface settlement tends to increase and then decrease as the distance from the excavation face increases
when the turning radius is taken to be small and the front shield length
shield articulation angle and over-excavation gap are taken to be large.