您当前的位置:
首页 >
文章列表页 >
Method for calculation of buckling critical load of pile foundation crossing karst cave in karst area
更新时间:2026-06-25
    • Method for calculation of buckling critical load of pile foundation crossing karst cave in karst area

    • Vol. 43, Issue 12, Pages: 3347-3356(2022)
    • DOI:10.16285/j.rsm.2022.0377    

      CLC: TU473.1
    • Online First:02 January 2023,

      Published:2022

    移动端阅览

  • LEI Yong, LI Peng-jia, LIU Ze-yu, et al. Method for calculation of buckling critical load of pile foundation crossing karst cave in karst area[J]. 2022, 43(12): 3347-3356. DOI: 10.16285/j.rsm.2022.0377.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

226

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Evaluation of landslide susceptibility degree based on catastrophe theory
Experimental study of mechanical characteristics of coal-serial mudstone under different temperatures
Experimental study of high embankment culvert treated by imperfect ditch covered with a geogrid layer
Experimental study of vertical bearing behaviors of super-long prestressed high-strength concrete pipe pile in soft clay
Experimental study of seismic behavior of prestressed pipe pile

Related Author

SONG Sheng-yuan
WANG Qing
PAN Yu-zhen
CHEN Jian-ping
XIANG Liang-jun
ZHA Wen-hua
SONG Xin-long
WU Teng-fei

Related Institution

College of Construction Engineering, Jilin University
Three Gorges Survey and Research Institute Co., Ltd..
Key Laboratory of Safety and High-efficiency Coal Mining Constructed by Anhui Province and Ministry of Education, Anhui University of Science and Technology
School of Energy Resources and Safety, Anhui University of Science and Technology
School of Civil Engineering and Architecture, Hubei University of Technology
0