您当前的位置:
首页 >
文章列表页 >
Preliminary study of unloading calculation method in the unloading collapse process of loess between piles
更新时间:2026-06-25
    • Preliminary study of unloading calculation method in the unloading collapse process of loess between piles

    • Vol. 43, Issue 9, Pages: 2399-2409(2022)
    • DOI:10.16285/j.rsm.2021.1904    

      CLC: TU444
    • Online First:12 September 2022,

      Published:2022

    移动端阅览

  • JIN Xin, WANG Tie-hang, HAO Yan-zhou, et al. Preliminary study of unloading calculation method in the unloading collapse process of loess between piles[J]. 2022, 43(9): 2399-2409. DOI: 10.16285/j.rsm.2021.1904.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

158

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Field test research on treatment effect of embankment foundation in class Ⅳ dead-weight collapsible loess zone along railway passenger dedicated line
A study progress on in-situ soaking test on collapsible loess
New recognition of collapsibility evaluation and remnant collapse of loess
Correlation analysis of collapsible parameters and independent physical indices of loess
Analysis of creep influence in long-term pile stress test

Related Author

QU Yao-hui
YANG Yin-hai
WEI Yong-liang
LI Ming
WANG Wen-di
WANG Xiao-jun
YANG Xiao-hui
HUANG Xue-feng

Related Institution

Northwest Research Institute Co., Ltd., of China Railway Engineering Corporation
The Second Navigation Engineering Bureau of China Communication Construction Company Ltd.
School of Architecture Engineering, Ningbo University of Technology
Ningbo Institute of Technology, Zhejiang University
Department of Architectural Engineering, Logistical Engineering University of PLA
0